PART466. ELECTRIC INTERCONNECTION OF DISTRIBUTED ENERGY RESOURCES FACILITIES  


§ 466.10. Scope
§ 466.15. Compliance
§ 466.20. Definitions
§ 466.30. Waiver
§ 466.35. Waiver [Renumbered]
§ 466.40. Technical Standards
§ 466.45. Pre-Application Report
§ 466.50. Interconnection Requests
§ 466.60. General Requirements
§ 466.70. Lab-Certified Equipment
§ 466.75. Limited-Export and Non-Exporting Distribution Energy Resources Facilities
§ 466.80. Determining the Review Level
§ 466.90. Level 1 Expedited Review
§ 466.100. Level 2 Expedited Review
§ 466.110. Level 3 Expedited Review
§ 466.120. Level 4 Review
§ 466.125. Material Modifications
§ 466.130. Disputes
§ 466.140. Records
§ 466.APPENDIX A. Level 1 Application and Contract
§ 466.APPENDIX B. Certificate of Completion
§ 466.APPENDIX C. Levels 2 to 4 Application
§ 466.APPENDIX D. Levels 1 to 4 Contract
§ 466.APPENDIX E. Interconnection Feasibility Study Agreement
§ 466.APPENDIX F. Interconnection System Impact Study Agreement
§ 466.APPENDIX G. Interconnection Facilities Study Agreement
SOURCE: Emergency rules adopted at 32 Ill. Reg. 6556, effective April 1, 2008, for a maximum of 150 days; adopted at 32 Ill. Reg. 14504, effective August 25, 2008; amended at 41 Ill. Reg. 862, effective January 20, 2017; emergency amendment at 45 Ill. Reg. 16330, effective December 14, 2021, for a maximum of 150 days; emergency expired May 12, 2022; amended at 46 Ill. Reg. 9666, effective May 26, 2022.

Notation

AUTHORITY: Implementing Section 16-107.5 of the Public Utilities Act [220 ILCS 5] and authorized by Sections 16-107.5 and 10-101 of the Public Utilities Act [220 ILCS 5].