Illinois Administrative Code (Last Updated: March 27, 2024) |
TITLE35. ENVIRONMENTAL PROTECTION |
PART1422. DESIGN AND OPERATION OF FACILITIES |
SUBPARTC. TREATMENT FACILITIES |
Section1422.APPENDIX A. Initial Efficacy Test Procedures |
§1422.TABLE C. Challenge Loads
Latest version.
-
This table identifies the three types of challenge loads of PIMW that must be used as part of the Initial Efficacy Test and Periodic Verification Test.
COMPOSITION OF CHALLENGE LOADS
% (w/w)
A
B
C
Moisture
≤ 5
≥ 50
– – –
Organic
– – –
– – –
≥ 70
(Source: Amended at 43 Ill. Reg. 10072, effective August 30, 2019)