§554.702. Data Required
Latest version.
-
The following data should be contained in the preliminary letter requesting appropriate permit forms:
a) The need for such crossing and a description of the operation contemplated;
b) The exact location where the crossing is to be made;
c) Whether a crossing is in existence or whether one is to be constructed;
d) A detailed description of the vehicles to be utilized in making the crossings and the material to be hauled;
e) The approximate number of crossings to be made in a given period, the time of day the crossings are to be made, and the length of time required for the operation to be completed; and
f) The traffic control proposed.