§820.500. General Prequalification Information  


Latest version.
  • Architects and professional engineers submitting permit applications and plans shall have been prequalified by the Department. Swimming facility contractors constructing a swimming facility shall have been prequalified by the Department. Prequalification is free of charge to the applicant. Each applicant for prequalification shall:

     

    a)         Ensure that the prequalification status is approved prior to submitting an application for a permit;

     

    b)         Notify the Department within 30 calendar days after any changes to information contained in the prequalification application. Failure to do so may result in loss of prequalification.

     

(Source:  Section 820.500 renumbered to Section 820.400 at 22 Ill. Reg. 9357, effective May 15, 1998; new Section 820.500 added at 37 Ill. Reg. 16539, effective October 4, 2013)