Illinois Administrative Code (Last Updated: March 27, 2024) |
TITLE77. PUBLIC HEALTH |
PART820. SWIMMING FACILITY CODE |
SUBPARTF. PREQUALIFICATION OF ARCHITECTS, PROFESSIONAL ENGINEERS AND SWIMMING FACILITY CONTRACTORS |
§820.500. General Prequalification Information
-
Architects and professional engineers submitting permit applications and plans shall have been prequalified by the Department. Swimming facility contractors constructing a swimming facility shall have been prequalified by the Department. Prequalification is free of charge to the applicant. Each applicant for prequalification shall:
a) Ensure that the prequalification status is approved prior to submitting an application for a permit;
b) Notify the Department within 30 calendar days after any changes to information contained in the prequalification application. Failure to do so may result in loss of prequalification.
(Source: Section 820.500 renumbered to Section 820.400 at 22 Ill. Reg. 9357, effective May 15, 1998; new Section 820.500 added at 37 Ill. Reg. 16539, effective October 4, 2013)