§240.1220. Contents of Application for Coal Test Hole, Mineral Test Hole, Structure Test Hole, or Coal or Mineral Groundwater Monitoring Well  


Latest version.
  • a)         Each application for a coal, mineral or structure test or coal or mineral groundwater monitoring permit shall be for those holes to be drilled in one section of land, as established by the official United States Public Land Survey, by the applicant.

     

    b)         Each application shall include:

     

    1)         A map showing the proposed location(s) of the test hole(s); except that in the case of structure, coal and mineral test holes, the application need only identify the Section.

     

    2)         The approximate proposed total depth of the test hole(s).

     

    3)         The type of drilling tools to be used.

     

(Source:  Former Section recodified to 240.1420; new Section added at 17 Ill. Reg. 14097, effective August 24, 1993)