PART1825. SPECIAL PERMANENT PROGRAM PERFORMANCE STANDARDS – OPERATIONS ON HIGH CAPABILITY LANDS  


§ 1825.11. High Capability Lands: Special Requirements
§ 1825.12. High Capability Lands: Soil Removal
§ 1825.13. High Capability Lands: Soil Stockpiling
§ 1825.14. High Capability Lands: Soil Replacement
SOURCE: Adopted at 4 Ill. Reg. 37, p. 1, effective June 1, 1982; amended at 6 Ill. Reg. 1, effective June 1, 1982; emergency amendment at 6 Ill. Reg. 8502, effective July 1, 1982, for a maximum of 150 days; codified at 8 Ill. Reg. 9363; amended at 6 Ill. Reg. 9987, effective September 3, 1982; amended at 10 Ill. Reg. 9628, effective July 1, 1986; amended at 11 Ill. Reg. 8526, effective July 1, 1987; amended at 20 Ill. Reg. 2130, effective January 19, 1996; amended at 22 Ill. Reg. 20286, effective November 5, 1998; amended at 26 Ill. Reg. 4288, effective March 6, 2002.

Notation

AUTHORITY: Implementing and authorized by the Surface Coal Mining Land Conservation and Reclamation Act [225 ILCS 720].