§8.8070. General  


Latest version.
  • a)         Suspension, debarment, nullification of prequalification, modification of prequalification, issuance of conditional prequalification, or denial of prequalification by CDB or the CPO is applicable to a vendor's direct contracts with CDB and to subcontracts on CDB projects, unless otherwise determined under Section 8.8090.

     

    b)         Suspension, debarment, nullification of prequalification, modification of prequalification, issuance of conditional prequalification, or denial of prequalification by CDB or the CPO is also applicable to a design-build entity's separate prequalification as an A/E or contractor with CDB, unless the circumstances are directly related to the design-build process and not to the type of performance provided as an A/E or contractor.  In these instances, CDB will issue a written determination supporting the action.