§812.306. Design of the Liner System  


Latest version.
  • The application shall contain information to show that the design of the liner system meets the minimum requirements of 35 Ill. Adm. Code 811.306, including the following information:

     

    a)         For Compacted Clay Liners:

     

    1)         Cross sections and plan views of the liner system;

     

    2)         Results of any field or laboratory tests demonstrating that the liner material complies with 35 Ill. Adm. Code 811.306(d);

     

    3)         A description of the test liner, including:

     

    A)        Diagrams and any supporting documentation showing that the test liner will be constructed and evaluated in accordance with 35 Ill. Adm. Code 811.507(a); or

     

    B)        A detailed description of the test liner constructed in accordance with 35 Ill. Adm. Code 811.507(a), if constructed prior to permit application;

     

    4)         A description of construction methods and equipment to be utilized; and

     

    5)         A construction quality assurance plan pursuant to 35 Ill. Adm. Code 811.Subpart E.

     

    b)         For geomembranes:

     

    1)         A description of the physical properties of the geomembrane;

     

    2)         Documentation showing that the design of the geomembrane meets the minimum requirements of 35 Ill. Adm. Code 811.306(e);

     

    3)         A description of the methods to seam the geomembrane in the field in compliance with 35 Ill. Adm. Code 811.306(e)(5);

     

    4)         A plan showing the proposed layout of the individual panels and the locations of all openings through the geomembrane;

     

    5)         A cross section and description of how openings in the membrane will be constructed to minimize leaks; and

     

    6)         A construction quality assurance program pursuant to 35 Ill. Adm. Code 811.Subpart E for proper construction, seaming and inspection of the geomembrane.

     

    c)         For Slurry Trenches and Cutoff Walls:

     

    1)         A description of the slurry trench or cutoff wall, including documentation of cross sections, material specifications and methods of construction to demonstrate compliance with 35 Ill. Adm. Code 811.306(f);

     

    2)         Location and descriptions of the boreholes, including the results of any testing; and

     

    3)         A construction quality assurance plan, pursuant to 35 Ill. Adm. Code 811.Subpart E.

     

    d)         For Alternative Liner Technology:

     

                A complete description of the technology, including documentation demonstrating that the technology will perform as required by 35 Ill. Adm. Code 811.306(f).