§722.363. Amendment of Contingency Plan  


Latest version.
  • The generator must review its contingency plan and immediately amend the plan, if necessary, whenever any of the following occurs:

     

    a)         Applicable regulations are revised;

     

    b)         The plan fails in an emergency;

     

    c)         The generator facility changes − in its design, construction, operation, maintenance, or other circumstances − in a way that materially increases the potential for fires, explosions, or releases of hazardous waste or hazardous waste constituents or which changes the response necessary in an emergency;

     

    d)         The list of emergency coordinators changes; or

     

    e)         The list of emergency equipment changes.

     

(Source:  Added at 42 Ill. Reg. 22047, effective November 19, 2018)