§604.1000. Presedimentation  


Latest version.
  • a)         Basin Design:  presedimentation basins must have the capability for dewatering.  These basins may include hopper bottoms or a continuous mechanical sludge removal apparatus;

     

    b)         Inlet:  short-circuiting must be prevented;

     

    c)         Bypass:  provisions for bypassing presedimentation basins must be included; and

     

    d)         Detention time must be adequate.  Unless otherwise approved by the Agency under Section 604.145(b), three hours detention is the minimum period.