Illinois Administrative Code (Last Updated: March 27, 2024) |
TITLE35. ENVIRONMENTAL PROTECTION |
PART371. REQUIREMENTS FOR PLANS OF OPERATION AND OPERATION AND MAINTENANCE MANUALS |
SUBPARTF. INTRODUCTION TO OPERATION AND MAINTENANCE MANUALS |
§371.200. Introduction
-
a) An O&M Manual provides long term, facility-specific guidance for all persons responsible for facility operation and maintenance.
b) An O&M Manual is required for all Step 3 state and federal construction grant projects.
c) O&M Manuals shall be submitted as follows:
1) One draft copy of the O&M Manual must be submitted to the Agency and approved before 50% of the grant payment of a Step 3 grant can be made.
2) Two final copies of the O&M Manual must be submitted to the Agency and approved before 90% of the grant payment of a Step 3 grant can be made.
3) All O&M Manuals must be sent for review to:
Illinois Environmental Protection Agency
Division of Water Pollution Control
Grant Administration Section
2200 Churchill Road
Springfield, Illinois 62706