Illinois Administrative Code (Last Updated: March 27, 2024) |
TITLE35. ENVIRONMENTAL PROTECTION |
PART1100. CLEAN CONSTRUCTION OR DEMOLITION DEBRIS FILL OPERATIONS AND UNCONTAMINATED SOIL FILL OPERATIONS |
SUBPARTC. PERMIT APPLICATION INFORMATION FOR CCDD FILL OPERATIONS |
§1100.308. Surface Water Control
Latest version.
-
The permit application must contain a plan for controlling surface water that demonstrates compliance with Section 1100.202 of this Part, and that includes at least the following:
a) A copy of any approved National Pollutant Discharge Elimination System (NPDES) permit issued pursuant to 35 Ill. Adm. Code 309 to discharge runoff from all filled areas of the facility, or a copy of any such NPDES permit application if an NPDES permit is pending; and
b) A map showing the location of all surface water control structures at the facility.